PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Building rebar mats for Elev. 5,6 (3rd Floor) Facing North-East (800x600).jpg Installing Domestic water and fire service pipes at Sprinkler Room (152A) Facing South (800x600).jpg Installing pour stops at Derrick -3 (2nd Floor) Facing South (800x600).jpg Pour Stops along edges of Derrick -3 (2nd Floor) Facing North-East (800x600).jpg Welded beam at Derrick -2  (800x600).jpg Before installing of pour stops Facing East (800x600).jpg Compacted area (underground Piping) Facing North-West (800x600).jpg Continued wiring the electrical panel Facing East (800x600).jpg Installing beam at Stair -4 (2nd Floor) Facing South (800x600).jpg
Previous pageNext page Welded beam at Derrick -2  (800x600)
Welded beam at Derrick -2 (800x600)